Case study

Cycle Route Improvement Scheme – Beverley Road, Hull

Download Case Study

November 2021

Overview

A £1.1 million 5 km dedicated cycleway along Beverley Road Hull from Dunswell Roundabout to Ferensway. Creating a safer cycling environment. Works include upgrades, new sections and new junction improvements at key points. Forming part of an integrated cycling network in Hull City.

Material Specification
SHW Clause 803 Type 1 , 100% IBAA and an IBAA Limestone Blend

Client
Hull City Council

Construction

150mm of Type 1 topped off with a 20mm binder and 6mm surface course. Some sections of the cycleway are to be topped off with a green coloured asphalt.

Benefit

IBAA is an extremely cost-effective material when compared to Primary Aggregates and BPUK is working towards a verified Carbon Footprint.

There are also advantages logistically when using IBAA due to the low density of the material allowing for fewer vehicle movements as this gives volumetric advantages over primary materials.